Tiling A Bathroom Floor Or Walls First
Use a pencil to mark the spot where you need to drill.
Tiling a bathroom floor or walls first. It isn t critical whether you install flooring or paint the walls first in an empty gutted room but there are a few reasons why installing the flooring first might eliminate potential problems. Use another piece of tape to make a small well to catch the dust when you drill. Make sure you do not use the.
Finish the floor tiles and then go back and do the bottom row. Once the walls are done except the bottom row then do your floor tile. Seriously do the walls first but leave out the bottom row.
Measure up first so you have a complete tile and the top and a part tile at the bottom or a half tile top and bottom rather than silly slivers of tile at the top or bottom of the wall. If we lay the floor tiles first and then the wall tiles we have to wait until the floor tiles are dry and firm before we pave and paste the wall tiles. Generally speaking the bathroom area should be first installed with wall tiles and then with floor tiles which will not delay the construction period.
If you tile the floor first you may accidentally damage the new floor by dropping things on it. Take a piece of wood and screw it into the wall level so that the second course can sit on it what s called a ledger board. Place some tape on the centre mark to prevent the drill.
If you prefer doing the shower floor first you can avoid accidental accidents by covering the new floor tile. Tile generally loses its decorative appeal well before it wears out so there is a good chance that your shower s tile is giving your bathroom a dated look. This may result in cracked tile.
This simple step can save a. There are two reasons.